Jan 2016: China

From News, By admin, Update March 10, 2016 at 3:10 pm
ALBA OS, enter into Preservation and?Preventative?Maintenance?contract with Chinese Offshore Rig manufacturer. Whereby OIM procedures where upgraded and tailoerd to suit the assets currently moving into a dormant state, which included but not limited to the following –
?
  • Create a master equipment list, based on physical survey and “as found” condition?assessment?of all equipment and systems?
  • Develop preservation & maintenance program database, tasks and schedules?
  • Review existing manufacturers warranties, preservation &?maintenance?guidelines to maximise compliance with the OEM and / or regulatory bodies?
  • Develop quality control plan to ensure the?effectiveness?of the preservation program?
  • Develop preservation / maintenance instructions for equipment that is installed outdoors, indoors, or in; in-door climate controlled enclosures. The instruction methods often include dehumidification, temperature control, turning and lubrication of safety and operational?critical?equipment, such as combustion driven generators, the?vessels?rotating?machinery?& the drilling package and?associated?rotating machinery as a minimum.

 

Copyright ©2015 Alba.com Inc
Dubai Office

18th floor, Suite 1801

City Tower -2, Sheikh Zayed Road

PO Box No 32665

Dubai - United Arab Emirates

UK Office

9 Cumbernauld House

Wilderness Brae

Cumbernauld, Glasgow

G673JG, Scotland UK